Most of my list consists in tops waiting to be quilted. I really should start FMQing some before I attempt any further piecing.
1.- Monochromatic log cabin (twin size) JUNE FINISHED
2.- Crazy for Shelburne Carolina Chains (queen size). Top done, needs basting and quilting. Instead: Sapphire comets OCTOBER FINISHED
3.- Blue Spiderweb (queen size). MAY FINISHED
4.- Upcycled Advent Calendar (blocks cut, need assembling, basting and quilting) AUGUST
5.- Jamestown Landing (queen size). All blocks done, need assembling, basting and quilting. Instead: Nine Patch Split NOVEMBER FINISHED
6.- En Provence (queen size). JANUARY FINISHED
7.- Grand Illusion (queen size). MARCH FINISHED
8.- Gypsy Caravan Crossroads (queen size). All blocks done, need assembling and quilting SEPTEMBER
9.- Senior quilt (queen size). Top done, needs borders added, basting and quilting DECEMBER
10.-Allietare (queen size). Top basted, needs quilting JULY
11.- Sticks and Stones (twin size) APRIL FINISHED
12.- Sampler (twin size). FEBRUARY FINISHED
1.- Monochromatic log cabin (twin size) JUNE FINISHED
2.- Crazy for Shelburne Carolina Chains (queen size). Top done, needs basting and quilting. Instead: Sapphire comets OCTOBER FINISHED
3.- Blue Spiderweb (queen size). MAY FINISHED
4.- Upcycled Advent Calendar (blocks cut, need assembling, basting and quilting) AUGUST
5.- Jamestown Landing (queen size). All blocks done, need assembling, basting and quilting. Instead: Nine Patch Split NOVEMBER FINISHED
6.- En Provence (queen size). JANUARY FINISHED
7.- Grand Illusion (queen size). MARCH FINISHED
8.- Gypsy Caravan Crossroads (queen size). All blocks done, need assembling and quilting SEPTEMBER
9.- Senior quilt (queen size). Top done, needs borders added, basting and quilting DECEMBER
10.-Allietare (queen size). Top basted, needs quilting JULY
11.- Sticks and Stones (twin size) APRIL FINISHED
12.- Sampler (twin size). FEBRUARY FINISHED
Comment