My real list is endless, so I will stick with what I need to finish before Christmas, in priority order.

-Tie up the loose ends and wrap up the SS packages and mail next weekend.

- assemble a quilted stocking for DGS. I have cross stitched 2 - 3" blocks, but still need to do the cuff. That will probably get added next year. Also need to assemble the stocking for DIL, but know I won't get to the cross stitched cuff this year. Maybe next.

-Sandwich and quilt my friends quilt (leftover from last Christmas)

- finish a coordinating table runner for same friend. Started, but still playing with the design)

- Sandwich a quilt a lap quilt for another co-worker

- I have a JRR top for someone else that is not big enough. I'm playing with ways to enlarge it, and just need to do it. Then I have to quilt it.

Way to much to do in a short amount of time, especially since 12 hours day at work will be starting soon. Very soon.